Amendment Number Three
to the
Red River Authority of Texas
Clean Rivers Program
Quality Assurance Project Plan
FY 2004 – 2005
Appendix B
Monitoring Schedule
Prepared in Cooperation with the
Texas Commission on Environmental Quality
Under the Authorization of the Texas Clean Rivers Act
Clean Rivers Program
Technical Analysis Division
Texas Commission on Environmental Quality
P. O. Box 13087
Austin, Texas 78711-3087
Questions concerning this amendment should be directed to:
Curtis W. Campbell, General Manager
Red River Authority of Texas
Hamilton Building, Suite 520
900 Eighth Street
Wichita Falls, Texas 76301-6894
(940) 723-8697
Fax (940) 723-8531
September 1, 2004
Justification: This document details the changes made to the basin-wide Quality Assurance Project Plan to update Appendix B for fiscal year 2005.
Summary of Changes: The following information in Appendix B is amended to reflect changes to:
• Table B1.1 with updated monitoring sites for the Authority for fiscal year 2005.
• Maps of the Red and Canadian River Basins depicting the Authority’s monitoring sites for fiscal year 2005.
Detail of Changes:
• The attached monitoring Table B1.1 in Appendix B is added to reflect the Authority’s monitoring for fiscal year 2005 in the Red and Canadian River Basins.
• The attached maps are added to Appendix B to reflect the Authority’s monitoring sites for fiscal year 2005 in the Red and Canadian River Basins.
These changes will be incorporated into the Authority’s QAPP document and TCEQ and the Authority will acknowledge and accept these changes by signing this amendment.
________________________________________________ __________________
Curtis W. Campbell, RRA Project Director Date
_________________________________________________ _________________
David Holub, RRA Quality Assurance Officer Date
_________________________________________________ _________________
Laurie Curra, CRP Project Manager Date
_________________________________________________ _________________
Sharon Coleman, Acting CRP Quality Assurance Specialist Date
_________________________________________________ _________________
Laurie Curra, CRP Project Quality Assurance Specialist Date
The Red River Authority will maintain this documentation as part of the project’s quality assurance records. It will be available for review and copies will be submitted to each project participant.
|
Segment |
Long Description |
Station |
Reg |
SC 1 |
SC 2 |
Pgm Code |
Conv |
Bact |
Inst Flow |
Field |
Comments |
|
0101 |
Canadian River Bridge at US 60-83 at
Canadian |
10032 |
1 |
RR |
RR |
IS |
4 |
4 |
4 |
4 |
|
|
0101 |
Canadian River Bridge on SH 70 North of
Pampa |
10033 |
1 |
RR |
RR |
IS |
4 |
4 |
4 |
4 |
|
|
0101B |
Rock Creek at Bridge in Electric City
near Borger |
10024 |
1 |
RR |
RR |
IS |
4 |
4 |
4 |
4 |
|
|
0101B |
Rock Creek at Hwy 136 Downstream of
Lake Weatherly West of Borger |
10025 |
1 |
RR |
RR |
IS |
4 |
4 |
4 |
4 |
|
|
0102 |
Lake Meredith near Intake Tower at Dam
Northwest of Sanford |
10036 |
1 |
RR |
CR |
RT |
12 |
12 |
|
|
|
|
0102 |
Lake Meredith North Canyon Arm |
10037 |
1 |
RR |
CR |
RT |
|
12 |
|
|
|
|
0102 |
Lake Meredith Mid-Lake between Blue
East and Fritch Fortress |
10038 |
1 |
RR |
CR |
RT |
12 |
|
|
|
|
|
0102 |
Lake Meredith Mid-Lake Southeast of
Martin's Canyon |
10039 |
1 |
RR |
CR |
RT |
12 |
12 |
|
|
|
|
0102 |
Lake Meredith Bugbee Canyon at Buoy
Line |
10043 |
1 |
RR |
CR |
RT |
|
12 |
|
|
|
|
0102 |
Lake Meredith North Turkey Creek Canyon
Arm |
10044 |
1 |
RR |
CR |
RT |
|
12 |
|
|
|
|
0102 |
Lake Meredith Big Blue Canyon Between
Chimney Hollow and Timber Hollow |
10045 |
1 |
RR |
CR |
RT |
|
12 |
|
|
|
|
0102 |
Lake Meredith Fritch Canyon Arm |
10049 |
1 |
RR |
CR |
RT |
|
12 |
|
|
|
|
0102 |
Lake Meredith, Meredith Harbor |
10050 |
1 |
RR |
CR |
RT |
|
12 |
|
|
|
|
0102 |
Lake Meredith Cedar Canyon Arm |
10051 |
1 |
RR |
CR |
RT |
|
12 |
|
|
|
|
0102 |
Lake Meredith South Canyon Arm |
10052 |
1 |
RR |
CR |
RT |
|
12 |
|
|
|
|
0103 |
Canadian River Bridge at US 87-287
North of Amarillo |
10054 |
1 |
RR |
RR |
RT |
|
4 |
4 |
4 |
|
|
0103A |
East Amarillo Creek at US 287 North of
Amarillo |
10018 |
1 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
0104 |
Wolf Creek Bridge at SH 305 North of
Lipscomb |
10058 |
1 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
0104 |
Wolf Creek at FM 1454 27.4 KM (17 mile)
East of Lipscomb |
10059 |
1 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
0201A |
Mud Creek at US 259 North of Dekalb |
15319 |
5 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
0202 |
Red River at SH 78 North of Bonham |
10127 |
4 |
RR |
RR |
RT |
4 |
4 |
|
4 |
|
|
0203 |
Unnamed Tributary Northeast of Hagerman
Road and Airport Rd upstream of City of Denison Grayson County Airport WWTP
Outfall |
RR200 |
4 |
RR |
RR |
FL |
|
12 |
12 |
12 |
|
|
0202A |
Bois D'Arc Creek at FM 100 North of
Honey Grove |
15318 |
4 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
0202A |
Bois D'Arc Creek upstream of City of
Bonham WWTP outfall at Old Bridge Site on 7 Oaks Road |
RR100 |
4 |
RR |
RR |
FL |
|
12 |
12 |
12 |
Flow Study |
|
0202C |
Pecan Bayou at FM 1159, 6 miles
Northeast of Clarksville in Red River County |
16001 |
5 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
202D |
Pine Creek at 271, approximately 7.8 KM
North of the City of Paris, (Permit # WQ001012-000), Campbell Soup Company |
10120 |
5 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
202D |
Smith Creek at US 271, 300 Meters
upstream of the confluence with Pine Creek, North of Paris |
17044 |
5 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
0202E |
Post Oak Creek at FM 1417 Southeast of
Sherman |
10115 |
4 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
0203 |
Lake Texoma Big Mineral Arm |
10130 |
4 |
RR |
RR |
RT |
4 |
4 |
|
4 |
|
|
0203 |
Lake Texoma at US 377 North of
Gordonville |
10131 |
4 |
RR |
RR |
RT |
4 |
4 |
|
4 |
|
|
0203 |
Lake Texoma at South End of Denison
Dam, West of SH 75A, North of Denison |
15440 |
4 |
RR |
RR |
RT |
4 |
4 |
|
4 |
|
|
0203 |
Lake Texoma Little Mineral Arm
Southeast of Preston Shores near intake Structure |
17480 |
4 |
RR |
RR |
RT |
4 |
4 |
|
4 |
|
|
0206A |
South Groesbeck Creek at US 287, 4
miles West of Quanah in Hardeman County |
16000 |
3 |
RR |
RR |
FL |
|
12 |
12 |
12 |
Flow Study |
|
0207 |
Prairie Dog Town Fork Red River Bridge
at US 62-83 North of Childress |
10136 |
1 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
0207 |
Lower Prairie Dog Town Fork Red River
at SH 207, 26 Miles South of Claude |
13637 |
1 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
0207A |
Buck Creek at US 83, 19 Miles North of
Childress in Childress County |
15811 |
1 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
0214 |
Wichita River at FM 810 West of Byers |
10145 |
3 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
0214 |
Wichita River at FM 369 |
10153 |
3 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
0214 |
Wichita River at SH 25 |
10155 |
3 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
0214A |
Beaver Creek at US 283/183
approximately 18.2 KM South of Vernon |
15121 |
3 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
0220 |
Pease River Bridge on FM 104 South of
Kirkland |
10167 |
3 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
0224A |
McClellan Creek at SH 273 22.5 KM (14
mile) North of McLean |
10064 |
1 |
RR |
RR |
IS |
4 |
4 |
4 |
4 |
|
|
0230A |
Paradise Creek at US 287 East of Vernon |
10094 |
3 |
RR |
RR |
RT |
4 |
4 |
4 |
4 |
|
|
0299A |
Sweetwater Creek at US 83 North of
Wheeler |
10072 |
1 |
RR |
RR |
IS |
4 |
4 |
4 |
4 |
|
|
0299A |
Sweetwater Creek at SH 152, 2.6 miles Southeast
of Mobeetie |
10074 |
1 |
RR |
RR |
IS |
4 |
4 |
4 |
4 |
|
|
|
|
|
|
|
|
|
156 |
280 |
140 |
160 |
|
Segment: TCEQ’s numberical code for stream Conv : Samples of Nutrients and Minerals Collected &Analyzed by
boundries. a Laboratory.
Long Description: Name and location of monitoring site. Bact : Indicator Bacterica (E. coli or Fecal Coliform)
Station: TCEQ Station ID Numbers Inst Flow: Instantameous Flow Meaurement at Time of Sampling
Reg: TCEQ Region where Station is Located Field: Parameters Measured in the Field; i.e.: Temperature, pH, DO,
Conductivity, Flow Serverity, Etc.
SC1: Monitoring Responsibility Comments: Any additional information concerning the monitoring site.
(RR) Red River Authority of Texas
SC2: Entity Conducting Sampling:
(CR) Canadian River Municipal Water Authority
Pgm Code: Program Code – Code that indicates the type
Of monitoring that will occur for a selected
Set of parametes at a location.
Rt - Routine Water Sampling/Baseline (Long term monitoring)
IS - Intensive/Systematic – Subwatershed monitoring on a cyclical basis.
FL – Flow Monitoring Study – Flow monitoring to support permit actions